Adobe house renovation - Carport gravel heap clearance



There has been a lot of gravel in the previous year, which is not so much in the light of the built-in wall, but it could not have been better in the middle of the car park.


On February 22, 2016, it was a surprisingly good time (more hot record was over).
In the afternoon, 18 degrees were measured. Taking advantage of the opportunity I started working
The inevitable: about 3 to 4 m3 of gravel crumbling.
The picture was enough to wear, because the door was out of the edges and the
It was also the place of a sliding gate. Let's talk about pictures.











At the end the remainder was swept away. That is why a lot more aesthetic was done.


Thanks to the favorable weather I made it with only 1.5-2 hours.
Of course my shirt could have been twisted, but the better it was to lie down in a tub with hot water :).