Electricity generating with solar cells and wind turbines

 

The solar cells are developed  for inducting electricity. There is an opportunity to give back electricity to the grid by solar cells, or they can be used places, where there are no electricity at all.

The wind turbines are made for supplying electricity, warm water or water-pumping. With the new generation of wind turbines the direct household warm water supply can also be solved.

Using the wind moving energy, a special generator is making direct current, which helps to fill a battery.

 

Usage proposal/Technical details:

Types of solar cells:

    Amorph: efficiency is 7-9%. Life period: 10 years with 3% fix capacity destruction.

    Polycrystal: efficiency is 9-12%. Life period: 25 years with 3% fix capacity destruction.

    Monocrystal: efficiency is 12-16%. Life period: 25 years with 3% fix capacity destruction.

    Details: without any moving piece, they are resistant against mechanical effects. Direct sun radiation is need to its working.

Offered fixing orientation: fixed to the south or with sun-detective system.

Inclination angle: 25-50°.

Types of wind turbines:

    1. Wind turbines with horizontal axle

Details: relatively small size, low priced, but with noisy working, responsive to tranzient wind types because it's driven by a weathervane.

The installation height is min. 8-10 meters, the place needs to be open and free of any objects.

It can be stand to a light-structure post. It's not recommended to install into a populous area caused by its noise. In Hungary, before installation, needs to be permitted (depending of its capacity and height).

    2. Wind turbines with vertical axle

Details: relatively huge size, high priced, but without any noise while working (0 dB). It's not responsive to the tranzient wind types. The installation height is relatively small. It can be install to populous area. It can only be stand to a heavy-duty post.

Aspects to be considered before install a wind turbine:

Geographical makings, the type of the area/house, the area is populous or not, type of the wind turbine which planned to install

Before installation it is highly recommended to examine the wind at the area for at least 3-6 months (in order to reach the appropiate capacity and the best efficiency).

 