Adobe house renovation – Underfloor heating and concrete flooring




Concrete has had time to knit throughout the winter and spring.

As a first step, tar paper had to be laid as insulation:


But it had to be repaired beforehand



And a little bit out of the way where it is not straight...



The whole room was vacuum cleaned



The tar paper edge was tilted to the wall.



A set of ready...



The scorch is warm enough ... I had to take a 30mbar pressure regulator ...



The room is transformed...



The whole thing was melted properly.



The final result:



For safety, I even put on a foil.



There is a nikecell on its edges, which is necessary because of the expansion of the concrete, so that it does not push the bottom of the walls.



A little carving...






One layer deposited.



Second layer.












Again, foil:



Then a grate.



Of course the film had to be put under some...



The grid is overlapping.






The floor ventilation and the underfloor heating pipe also go out to the old chimney.

The floor heating pipes had to be dismantled to the bathroom.



The first round:






This guriga was only 50 meters away ...



Here is the second round.



Distributor collectors are also tied.

Before the concrete was pressurized the system and the pressure was closed in the tubes.



Finally, the concreting:



The finished master bedroom is concrete with underfloor heating, insulation and lower ventilation layer :).







<< Back <<