Adobe house renovation – Main door replacement



The front door wasn't the real one either. It was "going out" so that it would be closed somehow.


At first, the "reed" bridge over the door had to be demolished.





There was PUR foam here, not just above the door. (The previous owner was definitely a PUR foam fetish ...)






The hallway was pretty draft :).



Here's more PUR foam than brick ...



The threshold was pushed into a 200 nail ...





Of course, without masonry, I didn't get it.







There was already a ladder here.





This is the new door


The threshold had also to be raised due to the future floor level (tiling).


The frame was drilled into the wall in 6 places after the bricks were fixed.






The final result:


Then it will be beautified if the wall next to it will be renewed, it will be superfluous to plaster it.













<< Back <<