Adobe house renovation – Demolition of mud



Unfortunately, the removal of the muddrop has become inevitable as the beams are bent and

rebuild the entire roof. Unfortunately, the boards are in very bad condition.
I managed to "get stuck" 2 times, but I didn't fall down (the bark beetle "well worked" in some places).


This is the gangway of the attic where the earth slit from the mud slit was thrown out.


It was a lot of dust and could not be used in many places because of the condition of the boards.


From the Forward: Clear boards, loose mud, original mud slabs.


This is the area of the living room. The large pipe is the ventilation end of the floor. The digging was more than a day ...


and much more remaining...


Here I go to the arch. The wheelbarrow could only be pushed down on the slatted planks.
The big hole is the place for the mass stove ...


It's in shape. 1 day, 1 room (the slab was getting thinner here).




This is the part above the workshop. Here, too, the boards are curved, but they are in better condition.


Finally: