Adobe house renovation – Workshop partition masonry
The sprinkling of the base lasted for two weeks, so it will be tied up completely with the water left in the ground.
It's got a bituminous insulation and the masonry started.
The location of the door is marked by three large bricks
Very low quality of this brick. There is a lot of mortar to do, because all sizes are inaccurate, but at least inexpensive.
The vertical and the plane are marked with strips attached to the wall and a cord.