Home – Adobe house - 2020
Large room, bathroom underfloor heating concreting, toilet door raising
The most problematic floor in the bathroom has been hiding so far ..
Unfortunately, it is full of pipes and other obstacles.
The great room was finished first. Much!
Some EPS packaging material has also been built in for safety reasons, because the foil has been used to poke the foil in a few places ...
Standard 2-circuit system.
It was a pleasure to tie this up, too. Luckily my dad helped here, so we ended sooner, but it still got dark ... In vain, the days are getting shorter and shorter.
Another day and another concreting followed.
Also in the bathroom.
The level of the hall is too low compared to the surrounding rooms, so I rather raised the toilet door 3cm higher.
The bridge was the upper limit.
After some planing, the spacer slat was exactly slotted out and screwed to the sill. This way you can put a thin layer of concrete in the hall.