Adobe house renovation

2020



Room and kitchen concrete replacement

Reconstruction of the cellar under the workshop

Cellar reconstruction from formwork, backfilling

Basement slab formwork and concreting

Living room door bridge dismantling, reconstruction

Workshop move the column in front of

Second room ceiling made of plasterboard

Bathroom, chamber concreting, pipe installation

Room electrical installation, meter cabinet demolition

Kitchen, room electrical installation, distribution re-installation

Workshop floor insulation, underfloor heating installation, concreting

Workshop electrical installation, ceiling slats, foiling

Kitchen ceiling slats, tank in the attic.

Workshop wall plastering, tiling, basement expiration boarding

2nd room, kitchen floor insulation, room underfloor heating installation

Kitchen, 2nd room underfloor heating, concreting

Moving the electric clock

Large room ceiling plasterboard

Large room, bathroom underfloor heating concreting, toilet door raising

Roof slat replacement

Attic boarding, beam end cutting

Hallway concreting, workshop door lock replacement

Door replacements