Adobe house renovation
2020
Room and kitchen concrete replacement
Reconstruction of the cellar under the workshop
Cellar reconstruction from formwork, backfilling
Basement slab formwork and concreting
Living room door bridge dismantling, reconstruction
Workshop move the column in front of
Second room ceiling made of plasterboard
Bathroom, chamber concreting, pipe installation
Room electrical installation, meter cabinet demolition
Kitchen, room electrical installation, distribution re-installation
Workshop floor insulation, underfloor heating installation, concreting
Workshop electrical installation, ceiling slats, foiling
Kitchen ceiling slats, tank in the attic.
Workshop wall plastering, tiling, basement expiration boarding
2nd room, kitchen floor insulation, room underfloor heating installation
Kitchen, 2nd room underfloor heating, concreting
Large room ceiling plasterboard
Large room, bathroom underfloor heating concreting, toilet door raising
Attic boarding, beam end cutting
Hallway concreting, workshop door lock replacement
Last update: 19.01.2021.