Adobe house renovation – Panelig
The kitchen was open to the porch (the wall was opened)
but the ceiling was missing ...
This picture was taken from the attic. Here you can see how to go to the kitchen ...
The paneling is 4 meters. These will be cut to 3, leaving 1,33m pieces without waste.
I painted them on both sides in advance.
This is important, because if you get misted from the top and swells, you can pull it out of place.
The joints could not be painted afterwards.
They were cut into circular saws of the same size
This kind of cutting saw is advantageous because every cut is guaranteed to be rectangular.
The
end result is:
Naturally, it also received rock wool insulation from above.
2017.november