The square metre price depends on the different substances of which use was made, layers and technologies and the engineering.
Let him be enquiring for the accurate price on our availabilities.
Brick houses' building
Earthwork:
The porter under main walls X cm depth, X cm wide, under the chimneys the exterior size of the pillar round X cm-rel a wider foundation trench or a trench are being made.
Grounding:
X quality prepares from transport concrete or field concrete.
Longer...
|

|
Light construction houses' building
Earthwork:
The porter under main walls X cm depth, X cm wide, under the chimneys the exterior size of the pillar round X cm-rel a wider foundation trench or a trench are being made.
Grounding:
X quality prepares from transport concrete or field concrete.
Longer...
|
 |
Ytong houses' building
Earthwork:
Landscaping, humus a layer's pushing down, setting, mechanical foundation trench highlighting X in cm width X cm in a depth, subsequently with a manual adjustment.
Grounding:
Porter under walls X cm deep X cm wide concrete lane basis X mixer from concrete.
Longer...
|
 |
Houses' shaping to intelligent
Onto intelligent houses' digital control we give a solution cut to fit claims of different manufacturers' products.
Requirements made on a control system the undermentioned ones:
- Switches the lamps off.
Longer...
|
 |
Renovations
- dismolition
- constructive substance transport
- mason works
- main wall redemption
- roof affirmation
- pool building
Longer...
|
 |
The building of roofs, attics are his building in
The attic building in the most economical opportunities offers it for it in order for us to create new living space. The attics carried out by us are equal to all requirements. The building of a system is suitable heat insulation, haze closing and the plasterboard carried out carefully in the attic.
Longer...
|
 |
The building of garages, outbuildings
The garage claims grew in a time with the growth of the automobiles. The family house there are proprietors in a vantage point, since in a lucky case if garage not too, but a car supplied with a roof standing in can be developed in the garden. Many people select this partial solution lacking right, that idéntől to a building permit bound to an announcement only already no.The car standing in one advisable at least 2,5-3 x onto 5-6 metre floor-spaces to plan, because this place is enough for a middle-class vehicle, but the local conditions may influence this on big one naturally.
Longer...
|
 |
The development of gardens
We undertake the construction of complete gardens, the planting of plants, grassing with seed sowing or lawn, the construction of garden lakes, rock gardens, the forming of buttresses, and everything what is connected to a garden.
Longer...
|
 |
|