Brick houses' building


Earthwork:
The porter under main walls X cm depth, X cm wide, under the chimneys the exterior size of the pillar round X cm-rel a wider foundation trench or a trench are being made.

Grounding:
X quality prepares from transport concrete or field concrete.

Footing wall:
Concrete from cellar wall one X cm in width, X sor in an altitude.

Charging:
Charging is made between the footing walls. The charging upper X cm the layer of vtg pebble, the rest of the land from filler. With the one pounding the charging layered condensed.

Inn level concrete:
Onto the footing walls felülően X cm thick, X from transport concrete, X cm division plane net a concrete layer prepares ironing.


Construction building

Tree protection:
Before a use onto the size tree cut a structural substance with an one soaking insect and mushroom we exempt it.

One against soil haze szigetelés:
X sticked onto the concrete layer under a truss mm thick bituminous nehézlemez insulation prepares against soil haze.

Exterior walls:
Because of the concrete of the inn level X sor the inner walls of the building are made of a manual building block,plastered on both sides, (or plasterboard) whitewashed.

Roof:
X between "E" beams concrete lining bodies X mm with wall concrete ironed with thick plane net. The lower plane of the roof plastered, whitewashed.

Wreath:
On sides being in contact with exterior space hőhídmentes with formwork staying in cradled X with head iron and X situation insurer with a stirrup X ironed with transport concrete concreted over a wreath is being made.

Roofage:
Traditional tree roofage (gable roof) X prepares cm pine from a plank.


Until a semi-finished state

Engineering basis cables:
The leading underground drain-pipes of the sewage are placed ill. the cable of the water of use.

Chimney:
X db cloak element, fireclay mounted chimney supplied with a lining pipe.

Tinsmith works:
On the building horganyzott from a disk semicircle a cross sectional gutter is being made. The sockets concerned the chimney edge horganyzott is made of sheet metal.

Héjalás:
X fixed with a plank type with roof foil, X mm with a normal roof plank onto a slatted surface, X covered with a roof tile.

Electric installation:
The electric installation concerned in a carved slot partitions with the building in of defender pipes guided in a frame on an evening. The basic price room X db switch, X db socket, X db lamp projection, and X square metre 1-1 telephone and a TV imply the development of accession place.

Insulation against soil haze:
X sticked onto the concrete layer on the full surface mm thick bituminous nehézlemez insulation is being made.

Heating basis mending:
Plastic drove in a defender pipe tackling with a multilayer heating pipe in the flooring. The cables the place of a radiator driving above the flooring concerned at the hot distributor.

Water of use:
Flooring concrete:
In the building X cm thick making a step standing expanded polystyrene foam X cm thick X quality flooring concrete is made, weighed down with a plank.


System until a ready state.

Exterior fenestrations:
Tree with heat-insulating glazing concerned X with a white colour db air chamber plastic fenestrations, tree mounted with five-point lock concerned with an entrance door with a plastic construction with a white colour, metal fixing mounted, gaps PUR sealed with foam. The exterior parapets from polystyrene developed.

Eaves boarding:
Pine from panelling hidden nailing prepares.

Plasterboard:
On the side walls and the ceiling 1 layers X mm thick plasterboard disk a casing is being made, duplicate gletteléssel and with polishing. The plasterboard impregnated in the bathroom, we make use of fire-proof plasterboard for the wrapping of a chimney part inside the flat.

Exterior surface trainings:
Onto the footing smoothed cement plaster, onto the exterior walls gúzolt onto a wall surface rough coating, big-bag nobleman plaster is being made then rubbed X mm with a structure. Onto the footing footing paint, onto the walls rolled vékonyvakolat is being made. The forming of the window parapets happens to nobleman plaster.


Until a turnkey state


Wrapping:
You are laminated floor roaminglap concerned wall tile.

Inner fenestrations:
The inner fenestrations the coffered winter of a pine which can be built in subsequently tree doors.

Painting:
The plasterboard onto a surface white X interior dispersion painting is made.

Fitting:
Electric installation fittings, faucets, sanitation the placement of árúk, radiators, a gas boiler.