Main pageAdobe house - 2020

Bathroom floor concreting, plumbing

As it turned out that the whole house would be heated by the floor, unfortunately the floor of the bathroom had to be picked up as well.
The piping route has also changed, so this too will be re-installed. (There will also be 1 shower and 2 floor confluences).



After picking up the concrete and digging out the ground, I got a gravel spread, which I leveled with an accuracy of 1cm.



The pipes had to be carved into the wall. Unfortunately, the base concrete also had to be engraved, which was in front of a large one

I cut it out with an angle grinder and a diamond wheel.



The bathroom will open to the washer-dryer room, which will have a washing machine and electric boiler at the back.



The outlet of the washing machine and boiler sewage glued with mortar.



The situation is complicated. There will be some floor confluences, one of which will be the bottom of the shower.



This is already the process of concreting. I kept the level with a laser level with an accuracy of a few mm.



By the end, there were a good many pipes on the floor. Most of the pipes will run in insulation between the two concretes.



The laser level is clearly visible on the mm scale on the spirit level.



Of course, there is not much light, but it is all the more warm. As the air condenses from the concrete, the jungle climate becomes stronger.

You could say there are already tropical mosquitoes here.
(The river is niear, the mosquito is a winner). :).



This is the concreting of the floor of the pantry. Here, too, the PVC pipe will run above the concrete in the insulation.



The big concrete cube stays there because I made it for a concrete column that held the roof because the wall here was very cracked ...

As I've mentioned a few times before, what I did once is if I don't have to break it down, because it's always made of fabric ....



The ditch dug into the water pipe finally disappears. I'm waiting for the concrete to set.



PVC pipes are the accessories of the future central vacuum cleaner.
Here comes another 10-14cm of styrofoam insulation, followed by the final concrete underfloor heating pipes.







<< Back <<